Specialist, Production
City:
Bangkok
Country/Region:
TH
Application Deadline:
30/09/2026
- Improvement of the production line by increasing efficiency (Develop New and Existing process)
- Improvement lead time for New and Existing process.
- Ensure production in each line can improve efficiency.
- Control and proceed to fully utilizing use manpower, tooling/machine and time in each line/department to meet production schedule.
- Generate report summary (Daily/Weekly/Monthly) in various points of view to suggest way to improve production efficiency and achieve KPIs.
- Drive Key Performance Indicators of the responsible area to ensure that products/ projects are delivered on time with the highest quality standard and lowest possible cost.
- Monitor production activities toward daily/ weekly/ monthly targets, minimizing costs where possible and ensure the best working practices.
- Daily shop floor presence to clearly visualize the progress and problem of Production situation and quickly adapt in an ever changing.
- Leading analysis of concern issue and create short term action that flexible and efficient. To finding the long term action to prevent the repeat issue.
- Encourage employees by inspiring, motivating, and mentoring them toward best-in-class practice to develop their competencies and attitude.
- Able to be role model and mentoring team toward best-in-class practice to develop their competencies and attitude.
- Execute assignment and project as assigned by Manager.
- Ensure all company’s asset are properly maintained and well looked after within responsible area